Completion Date: 2018
Location: California
EPC Scope:
EPC Scope: (2) – 138kV Generation Tie Lines (3) – 138/34.5kV Collector Substations (3 separate PPA’s) (1) – 138kV Switching Station – Build Transfer to...
View ProjectEPC Scope: (2) – 230kV Generation Tie Lines including POCO switch pole (3) – 230/34.5kV Collector Substation Full Telecom Scope including Cellular and Microwave Connections