Completion Date: 2011
Location: Van Wert, Ohio
Client: Iberdrola Renewables
The Blue Creek Wind Farm is a 345kV Interconnect Switchyard owned by American Electric Power. The switching station is a three breaker ring bus (designed for future expansion into a BAAH configuration) and ties into an existing AEP 345kV Convoy to East Lima transmission line and a new 345kV transmission line to the Blue Creek Wind Project.
230kV Interconnect Switchyard 230/34.5kV Collection Substation 230kV Transmission Line
View ProjectOne 230kV, 2000A gas circuit breaker One 230kV/34.5kV 75/100/125 MVA power transformer Five 38kV, 1200A vacuum circuit breakers Two 34.5kV 10 MVAR capacitor banks
View ProjectFor all positions, please submit resume and salary requirements to: [email protected]. ALL POSITIONS REQUIRE US CITIZENSHIP
Learn MoreProudly serving Austin, San Antonio, Houston, Dallas/Fort Worth, and Las Vegas since 1987.
Contact